New energy vehicle charging pile Because various policies have accelerated the pace of entering ordinary families, most car owners will choose to install them in their own parking spaces to solve the charging problem and reduce the use cost It is as simple to charge a car as it is to charge a mobile phone. Many prospective owners of new energy vehicles are not very clear about the installation process of the charging pile, which procedures and steps are required. So today, let's see how to apply for the installation of the new energy vehicle charging post.
It is understood that the installation of charging piles in the community needs the cooperation of the rear committee, property companies, and the rear people If any link is not passed, installation cannot be carried out. When applying for the installation of charging piles, the residents of the community should apply to the power supply department through the neighborhood committee, and the power supply department should send special personnel to the site to check. After meeting the conditions, the new energy vehicle owner, automobile manufacturer, charging pile installation enterprise, property management company, industry committee and other five parties jointly sign a consent letter before entering the site for installation.
The small editor roughly summarizes the basic process of applying for installing charging posts:
Step 1: property communication
The purpose is to obtain the property to issue the relevant certificate of approval for the construction of charging piles (required for the installation of electric power). Generally, it requires the property to agree to install charging piles in rental parking spaces or public parking spaces if there is no fixed parking space.
The property communication step may encounter certain difficulties. Some properties will refuse or delay handling for various reasons, such as safety, fire protection, neighborhood relations, parking space occupancy, insufficient power load, etc., so countermeasures need to be prepared in advance and the equipment supplier or installation service provider should provide necessary assistance.
Step 2: Installation site survey
After the proposed installation location is determined, contact the installation service provider (choose by yourself or provide by the vehicle manufacturer) to investigate the installation conditions on the site, formulate the installation scheme according to the site, and give a quotation.
Step 3: Power installation report
The car purchase certificate (required in some regions), relevant certificates of property consent, parking space use certificate (parking space property right certificate, parking space lease certificate), ID card and other relevant materials shall be submitted to the local power supply department for application for cable installation, or mobile phone APP (such as the National Grid).
Step 4: Installation of Charge Point
After the above processes are completed, the installation work can be implemented.