New energy vehicle charging pile What are the types?
Charging class|
Now many buses have been replaced with new energy electric vehicles. New energy electric vehicles have reduced fuel consumption to a certain extent, and the cost of using new energy electric vehicles is lower. Fully charged on the charging pile can run about 400 kilometers, only about 40 yuan.
So, what are the categories of charging piles for new energy vehicles?
Charging class|
✅ New energy pillar charging pile and wall mounted charging pile:
The pillar charging post is mostly used outdoors and can be installed directly in the open air. If the conditions are better, it can be installed in the shed to protect your car and charging equipment. Wall mounted charging piles are mostly installed in underground parking lots. Wall mounted installation does not occupy many places. Generally, they are AC charging piles. Most of them belong to the slow charging pile series. It takes 6 to 10 hours to fully charge.
✅ Public Charge Point, Special Charge Point and Self use Charge Point
We can see the public charging piles in the public parking lot. Generally, the DC piles are used. The charging power is high and the charging time is short. It takes 30 minutes to 2 hours to fully charge. The specific charging speed depends on the vehicle model. The special charging pile is generally installed in the company and is only used by internal personnel. Generally, it is a slow charging pile.
✅ Indoor charging pile and outdoor charging pile
Generally, outdoor charging piles can be installed directly in the open air. The equipment has a high waterproof grade and a high safety factor. The cost of indoor charging piles is relatively low.
✅ New energy AC charging pile and DC charging pile
AC charging piles, also known as slow charging piles, take a long time to charge, but the installation cost is relatively low. They can be used when connected to a 220V power supply. Basically, the community is equipped with AC charging piles. The installation of DC charging piles is troublesome. First of all, it is necessary to have a large load transformer that can meet the requirements of fast charging, which is not available in many old residential areas. The construction wiring adopts the large cable deep burial operation, and the site needs to be specially divided, and also needs professional personnel to carry out regular maintenance.
✅ Single pile single gun and single pile multi gun
Generally, those with single pile and multiple guns are double guns, and those with more than double guns are rarely seen.