If there is no electricity in the electric vehicle, we can use the charging pile to charge it. Now, New energy vehicle charging pile It has spread all over the country, which has facilitated people's life. Generally, the charging post provides two charging modes: conventional charging and fast charging. People can use a specific charging card to swipe the card on the human-computer interaction interface provided by the charging post. How to apply if you want to be qualified to install new energy charging piles? What is the application process? Let's have a look!
1. Submit application and review materials
The applicant user shall apply to the local power supply department for cable installation with the registration form, identity certificate (ID card or unit organization code card), photos of the parking space site environment, and parking space certification materials.
The power supply department, together with the application user and the construction subject, will go to the site to conduct power utilization and construction feasibility survey and determine the construction scheme. The power supply department shall issue a reply to the power utilization scheme within 7 working days and stamp on the registration form.
2. Installation construction
After the manufacturer has determined the construction scheme, it is time for installation and construction. Depending on the conditions of each community and the location of the garage, the construction time is also different. Some can be completed in 2 hours, while others can be completed in a whole day.
It should be noted that during the construction process, users generally do not need to pay construction fees for the first construction, but if the construction is not completed within one day and needs to be delayed to the next day, then the construction personnel will charge a certain labor cost, which is usually calculated according to the labor force and working hours, and is about several hundred yuan. In addition, the charging cable is free within 30 meters, and users need to purchase the cable if it exceeds 30 meters.
3. Construction and use
After the power supply department agrees to report for installation, the construction main body shall start to install charging piles for users within 7 working days.
After the construction is completed, the charging pile company will go to the electric power company for filing, and the electric power company will go to the site for acceptance. If the acceptance is qualified, the seal will be applied to the meter, and the electric power company will make the corresponding electric card, which will be collected by the charging pile company and handed over to the owner, or the owner will go to the power supply bureau to collect it himself.
The above describes the process of installing the charging pile of new energy vehicles, hoping to be helpful to everyone. You can also consult us for other questions. We are a charging pile manufacturer, specializing in the production of new energy charging piles, car charging piles, residential wall mounted, floor mounted AC charging piles, DC charging piles, etc. If you need it, please contact us!