Electric vehicle charging pile

News Center

Current location: home page > News Center > Technical Information

What kind of demand does the construction of new energy vehicle charging pile need to meet? Textu tells you

2022-01-11 11:14:11
second

The state advocates environmental protection and resource conservation. With the rise of new energy in the past few years, everyone is aware of the problem, New energy vehicle charging pile As long as it is charged, it does not need to spend a lot of money to refuel, which was once popular with the public. But this problem is about charging. What needs should be met when setting up a new energy charging pile? Now let's let Testu's small editor come to express why:

 New energy vehicle charging pile

(1) Reliability of communication - the communication system shall withstand the test of harsh environment and strong electromagnetic interference or noise interference for a long time, and keep the communication unblocked.

(2) Construction cost - under the premise of meeting the reliability, the cost of building the vehicle charging pile and the cost of long-term use and maintenance shall be comprehensively considered.

(3) Bidirectional communication - it can not only upload information, but also release control quantity.

(4) Multi service data transmission rate - With the continuous growth of terminal traffic in the future, the communication between master station and sub station, and between sub station and terminal requires higher and higher data transmission rate to achieve multi service.

(5) Flexibility and scalability of communication - Since charging piles (plugs) are characterized by many control points, wide areas and dispersion, standard communication protocols are required. With the development of the "ALLIP" network technology trend and the continuous growth of power operation business, IP based business bearer needs to be considered, and it is required to facilitate installation, construction, commissioning, operation and maintenance.

With the development of the city, it needs to be flexible and expandable, so the construction of new energy charging piles needs to meet the above five needs. I believe this article can help you. Guangxi Textu Automobile Technology Co., Ltd. integrates production, installation and sales. If you need it, please contact us directly to order.


Next: period

Recent browsing: