Electric vehicle charging pile Nowadays, it has become more and more common in our life, because the popularity and development of new energy vehicles have increased the demand for charging piles. For the convenience of charging, people will choose to install one by themselves. The installation of charging pile includes two parts: one is that the charging pile is fixed to the wall; The second is the laying and connection of the line from the ammeter to the charging pile. Everyone is curious about how to charge for installing the charging post? Then, let's get to know it together!
At present, there are five main ways to install and charge charging piles:
Method 1: After purchasing a car in the 4S store, the charging post will be given as a gift and responsible for laying and connecting the wires from the ammeter to the charging post within 30 meters and fixing the charging post to the wall (free of charge). If it is more than 30 meters, the extra part will be charged separately. 3 * 6mm2 cable is used, which is generally charged at 40-45 yuan/m (including labor+material costs), but the cost of special projects such as cutting through walls and high altitude is calculated separately - most car enterprises use this method;
Method 2: After buying a car at the 4S store, the charging post is given as a gift and is responsible for fixing the charging post to the wall (note that it is not responsible for the laying and connection of the line from the ammeter to the charging post. If service is required, it will be charged separately. The charging standard is 3 * 6mm2 cable, 40-45 yuan/m, labor+material costs for the block), but the cost of special projects such as cutting through the wall and high altitude will be charged separately - BYD, a representative enterprise;
Mode 3: After purchasing the car, purchase the charging post by yourself. The car factory is responsible for laying and connecting the wires from the ammeter to the charging post within 80 meters and fixing the charging post to the wall. If it is more than 80 meters, the extra part will be charged separately. 3 * 10mm2 cable charges 70 yuan/m, 5 * 10mm2 cable charges 90 yuan/m (including labor+material costs), but special engineering costs such as cutting through the wall and high altitude are calculated separately - representative enterprise Tesla;
Mode 4: Buy a charging pile from a treasure, and the store is responsible for laying and connecting the wires from the ammeter to the charging pile and fixing the charging pile to the wall. 3 * 6mm2 cables are used, and the general charge is 35-40 yuan/m (labor+material costs for the package), but the costs for special projects such as cutting through the wall and high above the ground are calculated separately;
Mode 5: self purchase of charging posts and cable wires in a treasure, 3 * 6mm2 cable, generally 18-20 yuan/m, 3 * 10mm2 cable, generally 25 yuan/m. Install it by yourself or ask an electrician to install it. Electricians are generally charged by working hours, about 500-600 per half day (depending on the economic level of each region, slightly different).
The owner can choose the installation method according to his own actual situation, and the above methods are for your reference. We are a charging pile manufacturer, specializing in the production of new energy charging piles, car charging piles, residential area wall mounted, floor mounted AC charging piles, DC charging piles, etc. Welcome customers to order!