Electric vehicle charging pile

News Center

Current location: home page > News Center > Industry information

New Energy Charging Pile Chapter | What conditions and preparation process are required for operating charging piles and charging stations?

2022-11-30 10:56:51
second

If an enterprise or individual wants to invest in and operate the charging pile by itself, what process does it need to go through from preliminary preparation to formal completion and operation?

 Operation charging pile

Legend of charging pile station construction


Business license



First of all, if you want to operate the charging pile yourself, you need to have the most basic operation qualification, that is, you need to have a business license with the business scope of electric vehicle charging and changing services. This is the basis.



Reasonable site selection



Secondly, if you want to operate the charging pile, the installation site of the charging pile, that is, the site selection, is very important. Land planning license and land use permit are required for the selected installation site. The selected installation site should also be located in a site with convenient transportation and lots of traffic. If the land is not self owned, it is also necessary to provide a land lease contract with the right to use.



Land filing



Then, we need to go to the local development and reform department where the station is located for filing, and fill in the exact information such as investment amount, charging pile type, number of investment piles, distribution capacity required, and construction completion time.



Apply for electricity quota



The next step is to go to the local power department to apply for the corresponding electricity quota and packaging plan. Pay attention to this step, and bring the business license, land lease contract, filing certificate, etc. that have been applied for.



After that, the operator needs to go to the qualified power design and power competent department to design and review the drawings.



Formal construction



After the above qualifications are applied for, the subsequent charging pile construction can be carried out with confidence and boldness. However, it should be noted that it is necessary to coordinate the ground breaking permit issued by municipal departments and other departments, and find professional power construction qualification departments for subsequent construction.



Acceptance test



After the construction has been completed and the charging pile stations have been built, it is necessary to apply to the power department for a complete acceptance test, and then apply to the power station to start high-voltage connection and power transmission.



After the above steps have been completed, the power station can be officially put into operation.



Although the construction period of the charging pile is not very long, each step needs to be declared and approved in the early stage. It needs to follow the national process and can not "do as you please". Fortunately, the country has listed the new energy charging pile as one of the "seven new national infrastructure", and encouraged social capital to actively participate in the construction, which is enough to show that the country attaches great importance to the construction of new energy charging pile. The construction of new energy charging pile is expected in the future!


 image.png

Charging pile construction



Recent browsing:

Related products

Related news