Suining Guangxi Charge Point Price
How to properly charge in the hot link when using the charging pile of new energy vehicles? 1. Take care of your electric donkey and don't let it get sunburnt: in hot summer, you often sweat, and the rechargeable battery often "gets high fever". Here, it is recommended that the owner choose a place with a parking shed or a barrier to cover the electric vehicle as far as possible, and don't let the electric vehicle be exposed to the sun immediately, which will endanger the service life of the vehicle. In addition, fire accidents are very likely to occur under high temperatures. 2. Do not "steam up and cook down": the temperature is already hot. If the electric car is exposed to the sun at the moment, but you are charging the car, the rechargeable battery will generate heat in the whole process of charging. At this time, all cars are in the "steam up and cook down" mode, and you will "deploy" carelessly. 3. The electric vehicle must also take a proper "rest". 4. The charging time must be well controlled.
Suining Guangxi Charge Point Price
Both the mileage and the number of charging posts have made great progress over the previous years. According to the reporter, at present, the driving range of the mainstream models of new energy vehicles and passenger vehicles in China has reached more than 300 kilometers, which is in line with the international advanced level. The energy density of the single power battery of the leading enterprise has reached 2 watt hours per kilogram, and the price has reached 1.2 yuan per watt hour. These two indicators have respectively increased by two times and decreased by 70% compared with 2012. At the same time, the construction of charging network is progressing steadily, and the coverage of public places, residential quarters, internal units, highways and other major places is increasing significantly. By the end of 2017, 214000 public piles had been built nationwide, an increase of 51% year on year, ranking first in the world in terms of ownership, and the installation rate of new users' private piles exceeded 80%.
Suining Guangxi Charge Point Price
With the gradual maturity of the entire new energy vehicle industry chain and the gradual release of market demand, the industry is about to erupt in 2018, but the problems of insufficient structural supply of charging infrastructure and the overall scale lag are increasingly prominent. It is urgent to make up for shortcomings and accelerate the construction of supporting infrastructure such as charging piles. How can we solve the problem of insufficient structural supply of charging infrastructure? Is there any successful case of innovative practice worth learning? There is a big gap in the charging pile. Under the global environment of resource conservation and green economy development, new energy vehicles are developing very rapidly. As the power guarantee of new energy vehicles, the charging pile is highly concerned by all circles. It can be said that the construction of charging infrastructure is one of the key factors affecting the promotion of new energy vehicles in China, and is more related to the development prospects of new energy vehicles.
Suining Guangxi Charge Point Price
6. Safety protection function: ① The AC charging pile (bolt) shall be equipped with an emergency stop switch, which can be used to stop charging manually or by remote communication; ② The AC charging pile (bolt) shall have the leakage protection function at the output side; ③ AC charging pile (plug) shall have output side overcurrent and short circuit protection functions; ④ AC charging post (bolt) shall have flame retardant function; 7. IP protection level: AC charging pile (plug) shall comply with IP54 (outdoor), and be equipped with necessary rain proof and sun protection devices; 8. Three proofing (anti moisture, anti mildew, and anti salt fog) protection The printed circuit board, connector and other circuits in the charger shall be treated against moisture, mildew, and salt fog. The salt fog corrosion resistance shall meet the requirements in Table 9 of GB/T 4797.6-1995 Natural Environmental Conditions for Electrical and Electronic Products Dust, Sand, and Salt Fog, so that the charger can be wet Normal operation in the environment with salt fog;
Suining Guangxi Charge Point Price
9. Anti rust (anti oxidation) protection The iron shell of the charging pile (bolt) and the exposed iron support and parts shall be provided with double-layer anti rust measures, and the non-ferrous metal shell shall also be provided with anti oxidation protective film or anti oxidation treatment; 10. The wind protection charger installed on the platform and exposed parts shall be able to withstand the relative wind speed in different areas and at different heights specified in Table 9 of GB/T 4797.5-9 Natural Environmental Conditions for Electrical and Electronic Products - Precipitation and Wind; 11. The shell door of the anti-theft protection electric pile (bolt) shall be equipped with an anti-theft lock, and the bolt fixing the AC charging pile (bolt) must be installed or removed after opening the shell door; 12. The temperature rise requires that the AC charging pile (plug) operates continuously under rated load for a long time, and the temperature rise of internal heating elements and parts shall not exceed the provisions in Table 2 of Q/GDW 397 2009;