Dujiangyan Guangxi Charging Pile Products
After the completion of charging piles in some places, operation and maintenance become a problem. On the one hand, the number of urban public charging facilities is small, and the distribution is uneven and unreasonable; On the other hand, the management service platforms of the charging infrastructure construction and operation units have not yet achieved interconnection, nor has there been a unified, open and convenient payment platform, which has caused great inconvenience to charging infrastructure users. In addition, in the development process of new energy vehicle industry, there is a widespread problem of focusing on vehicles rather than charging infrastructure. In addition, the national early support policy is mainly aimed at new energy vehicles and does not cover charging facilities. Except for a few cities, most cities have no local subsidies. "This leads to the coexistence of vehicles without piles and piles without vehicles." Moreover, charging infrastructure construction involves urban planning, construction land, distribution network construction and transformation, property management and other aspects, and it is necessary to coordinate multiple competent departments and relevant units in the implementation process.
Dujiangyan Guangxi Charging Pile Products
The increase of power battery capacity of new energy vehicles: the fast charging performance of the power battery determines the ceiling of the fast charging pile. The development of DC fast charging pile requires the cooperation of the power battery. At present, battery manufacturers such as Ningde Times and BYD are trying to improve the energy density of batteries to enhance the endurance. In 2020, the energy density of new pure electric passenger vehicles has basically exceeded 150Wh/kg, and the average endurance mileage has exceeded 400km. The improvement of the endurance mileage of new energy vehicles has improved the practicability of high-power DC public piles, and accelerated the preference of vehicle owners for DC piles, which is the key reason why DC piles will become the choice direction of public piles in the future.
Dujiangyan Guangxi Charging Pile Products
As the energy supply device of electric vehicle, the charging performance of electric vehicle charging post is related to the service life and charging time of the battery pack. This is also one of the aspects that consumers are most concerned about before buying electric vehicles. It is the basic principle for the design of electric vehicle charger to realize fast, efficient, safe and reasonable power supply for the power battery. In addition, the applicability of the charger to various power batteries should also be considered. The control system of the fast charger consists of: the control system of the fast charger adopts an intelligent variable pulse charging mode, that is, charging current pulse, including charging pulse T1, intermittent pulse T2 and discharge pulse T3.
Dujiangyan Guangxi Charging Pile Products
Both the mileage and the number of charging posts have made great progress over the previous years. According to the reporter, at present, the driving range of the mainstream models of new energy vehicles and passenger vehicles in China has reached more than 300 kilometers, which is in line with the international advanced level. The energy density of the single power battery of the leading enterprise has reached 2 watt hours per kilogram, and the price has reached 1.2 yuan per watt hour. These two indicators have respectively increased by two times and decreased by 70% compared with 2012. At the same time, the construction of charging network is progressing steadily, and the coverage of public places, residential quarters, internal units, highways and other major places is increasing significantly. By the end of 2017, 214000 public piles had been built nationwide, an increase of 51% year on year, ranking first in the world in terms of ownership, and the installation rate of new users' private piles exceeded 80%.
Dujiangyan Guangxi Charging Pile Products
Charging or changing? It is difficult to break through the pain points of the construction of power exchange stations: the construction speed of power exchange stations is amazing. From August 2019 to December 2020, the number of power exchange stations has increased from 245 to 734 in more than a year. The top three operators are respectively Aodong, Weilai and Botan, 286, 175 and 94. The electric vehicle power change mode refers to the centralized storage, charging and distribution of a large number of batteries through a centralized charging station, and the battery replacement service for electric vehicles in the battery distribution station or the integration of battery charging, logistics allocation and power change services. However, the pain point of the power exchange mode is still the bottleneck that is difficult to break through.