Nanchong Private Car Charging Pile Company
Charging or changing? It is difficult to break through the pain points of the construction of power exchange stations: the construction speed of power exchange stations is amazing. From August 2019 to December 2020, the number of power exchange stations has increased from 245 to 734 in more than a year. The top three operators are respectively Aodong, Weilai and Botan, 286, 175 and 94. The electric vehicle power change mode refers to the centralized storage, charging and distribution of a large number of batteries through a centralized charging station, and the battery replacement service for electric vehicles in the battery distribution station or the integration of battery charging, logistics allocation and power change services. However, the pain point of the power exchange mode is still the bottleneck that is difficult to break through.
Nanchong Private Car Charging Pile Company
In this environment, major automobile manufacturers in the automobile industry are also constantly shifting their focus to the research and development of new energy vehicle technology, and have also launched many new energy vehicles to replace oil with electricity and reduce emissions. This also represents the new direction of future automobile development. In China, friends who pay more attention to cars can see that more and more new energy vehicles are running on the road. More people are also aware of the benefits that new energy vehicles bring to the earth. The country is also introducing various preferential policies to vigorously promote the development of new energy vehicles. However, the main reason why some people are unwilling to buy new energy vehicles is the lack of endurance and inconvenient charging. However, with the continuous popularity of electric vehicles, these problems will certainly be solved in the future. Previously, the country also made a series of decisions in order to facilitate the charging of cars in the future.

Nanchong Private Car Charging Pile Company
The function of the charging post is similar to that of the gas dispenser in the gas station. It can be fixed on the ground or wall, installed in public buildings (public buildings, shopping malls, public parking lots, etc.) and residential parking lots or charging stations, and can charge various types of electric vehicles according to different voltage levels. The input end of the charging pile is directly connected with the AC power grid, and the output end is equipped with a charging plug for charging the electric vehicle. Generally, the charging pile provides two charging methods: conventional charging and fast charging. People can use a specific charging card to swipe the card on the human-computer interaction interface provided by the charging pile to print the corresponding charging method, charging time, cost data and other operations. The charging pile display screen can display the charging amount, cost, charging time and other data.
Nanchong Private Car Charging Pile Company
Integrated overview: the fast charging pile (plug) equipment adopts the AC/DC integrated structure. It can realize both DC charging and AC charging. When there are many charging services in the daytime, DC mode is used for fast charging. When there are few users in the charging station at night, AC charging can be used for slow charging. Appearance features: 1. Ergonomic design, taking full account of Chinese characteristics, after installation, the height of the whole machine, the height of the screen, the height of the keyboard, and the height of the charging connector slot are suitable for operation; 2. The form of upper outlet saves half of the operator's physical strength; 3. In consideration of people's usage habits and durability, touch and keyboard are mutually backed up. Touch screen and keyboard are designed to be rain proof and dust-proof; 4. Emergency stop switch with emergency stop; The charging connector placement slot is waterproof; 5m long flexible cable.

Nanchong Private Car Charging Pile Company
AC type: Technical requirements for AC charging pile (plug) 1. Requirements for environmental conditions: ① Working environment temperature: - 20 ℃~+50 ℃; ② Relative humidity: 5%~95%; ③ Altitude: ≤ 1000m; ④ Installation site: outdoor; ⑤ Seismic capacity: ground horizontal acceleration 0.3g; Ground vertical acceleration 0.15g; The equipment shall be able to withstand three continuous sine waves under simultaneous action, and the safety factor shall be greater than 1.67; 2. Structural requirements: ① The shell of AC charging pile (bolt) shall be firm; ② In structure, it is necessary to prevent hands from easily touching the exposed part; ③ The AC charging post (bolt) shall be a steel composite structure with a thickness of more than 1.0, and the surface shall be treated with plastic immersion, and the requirements for heat dissipation shall be fully considered. The charging pile (bolt) shall have good shielding function against electromagnetic interference; ④ The charging pile (bolt) shall have sufficient support strength;