Where is Deyang Guangxi charging post
DC piles are the inevitable choice of public piles in the future: at present, the proportion of public AC and DC charging piles remains around 6:4, and the proportion of AC piles is more, mainly because in the early stage of the industry development, slow charging AC piles are very suitable for manufacturers to seize the market, relying on the characteristics of simple structure, mature technology and low cost, However, after the technology and market of charging piles become mature, DC piles are the inevitable choice for future public charging piles. The average charging time of the DC charging pile is 1 hour and 54 minutes. 85% of the users can finish charging within 2.5 hours, while the average charging time of the AC charging pile is 5 hours and 45 minutes. 66.2% of the users need more than 5 hours of lengthy charging time. The difference between the two nearly 4 hours of time directly determines the obvious use preference of the car owner Z.
Where is Deyang Guangxi charging post
Charging or changing? It is difficult to break through the pain points of the construction of power exchange stations: the construction speed of power exchange stations is amazing. From August 2019 to December 2020, the number of power exchange stations has increased from 245 to 734 in more than a year. The top three operators are respectively Aodong, Weilai and Botan, 286, 175 and 94. The electric vehicle power change mode refers to the centralized storage, charging and distribution of a large number of batteries through a centralized charging station, and the battery replacement service for electric vehicles in the battery distribution station or the integration of battery charging, logistics allocation and power change services. However, the pain point of the power exchange mode is still the bottleneck that is difficult to break through.
Where is Deyang Guangxi charging post
How to properly charge in the hot link when using the charging pile of new energy vehicles? 1. Take care of your electric donkey and don't let it get sunburnt: in hot summer, you often sweat, and the rechargeable battery often "gets high fever". Here, it is recommended that the owner choose a place with a parking shed or a barrier to cover the electric vehicle as far as possible, and don't let the electric vehicle be exposed to the sun immediately, which will endanger the service life of the vehicle. In addition, fire accidents are very likely to occur under high temperatures. 2. Do not "steam up and cook down": the temperature is already hot. If the electric car is exposed to the sun at the moment, but you are charging the car, the rechargeable battery will generate heat in the whole process of charging. At this time, all cars are in the "steam up and cook down" mode, and you will "deploy" carelessly. 3. The electric vehicle must also take a proper "rest". 4. The charging time must be well controlled.

Where is Deyang Guangxi charging post
The charging pile body is mainly composed of human-computer interaction unit, control unit, metering unit and safety protection unit. The human-computer interaction unit mainly includes: pile, LCD touch screen, card reading module and charging plug; The control unit mainly includes: main monitoring and auxiliary module; The metering unit is electric energy meter; The safety protection unit includes: leakage protection switch, anti fall switch, emergency stop switch, overvoltage and undervoltage protection unit.
Where is Deyang Guangxi charging post
The function of the charging post is similar to that of the gas dispenser in the gas station. It can be fixed on the ground or wall, installed in public buildings (public buildings, shopping malls, public parking lots, etc.) and residential parking lots or charging stations, and can charge various types of electric vehicles according to different voltage levels. The input end of the charging pile is directly connected with the AC power grid, and the output end is equipped with a charging plug for charging the electric vehicle. Generally, the charging pile provides two charging methods: conventional charging and fast charging. People can use a specific charging card to swipe the card on the human-computer interaction interface provided by the charging pile to print the corresponding charging method, charging time, cost data and other operations. The charging pile display screen can display the charging amount, cost, charging time and other data.