Article publishing
Home page > Article publishing > Wanyuan Guangxi Charging Post Model

Wanyuan Guangxi Charging Post Model

Release time: 2023-10-29 01:28:38
 Wanyuan Guangxi Charging Post Model

Wanyuan Guangxi Charging Post Model

3. Power requirements: ① Input voltage: single-phase 220V; ② Output power: single-phase 220V/5KW; ③ Frequency: 50Hz ± 2Hz; ④ Allowable voltage fluctuation range: single-phase 220V ± 15%; 4. Electrical requirements: ① After the correct connection of plug and socket is confirmed to be successful, the circuit that can be opened and closed with load can be closed to supply power to the socket; ② The leakage protection device shall be installed on the incoming side of the power supply cable; ③ The protection of low-voltage distribution equipment and lines shall meet the relevant provisions in the Code for Design of Low Voltage Power Distribution (GB/50053); ④ For the distribution line of IT system, in case of ground fault, the insulation monitoring device shall send out audio or light signals. In case of the second phase to phase ground fault, the fault circuit shall be cut off by the over-current protection appliance or leakage current action protector; ⑤ In the lighting distribution system, the lighting and socket circuits should not be powered by the same circuit.

 Wanyuan Guangxi Charging Post Model

Wanyuan Guangxi Charging Post Model

Any problems arising from development must be solved with a development perspective and innovative practice. By innovating the operation mode of "mixed ownership", Shenzhen has solved the problem of "one kilometer after Z" in the promotion of new energy public transport, and the measures to realize the pure electrification of exclusive public transport are worthy of reference for the industry. "The charging pile has a large capital investment and rapid technology update. Without the intervention of companies with technical reserves and market power, it would be difficult for enterprises to survive." As one of the top three bus companies in Shenzhen, Yu Gang, the chairman of Shenzhen Bus Group, has a deep understanding of the "charging pile problem" encountered in the promotion of pure electric bus. Yu Gang introduced that the public transport group in a city in China had invested more than 200 million yuan to build 200 charging piles, each charging pile cost about 1 million yuan, 2-3 times the market price. Z could not recover the cost at last, and because it could not keep up with the technology update, many equipment was currently idle.

 Wanyuan Guangxi Charging Post Model

Wanyuan Guangxi Charging Post Model

Charging every day: For many commuters, it may be enough to charge the car once every two or three days. However, some experts suggest that you should not try to save time and charge frequently every day, so that the battery can be in a shallow cycle state, which is more conducive to extending the service life. Pay attention to the phenomenon of poor contact between the plugs at both ends of the charging line: poor contact will lead to the heating of the plug, and once the heating time is too long, short circuit may occur, thus damaging the charger and battery. Therefore, the owner needs to check and replace the connector in time.

 Wanyuan Guangxi Charging Post Model

Wanyuan Guangxi Charging Post Model

Small electric vehicles are different from traditional gasoline vehicles. What should we pay attention to during maintenance? For electric vehicles, the battery acts as its "heart", controlling the forward power of the vehicle. Especially in the charging process, we need to pay special attention! Common sense of electric vehicle charging: batteries should not be overcharged or discharged too much: overcharge and discharge of batteries will reduce their service life. Overcharging will cause the battery to heat up, which may cause spontaneous combustion, explosion and other hazards in serious cases. While driving, if the electricity meter indicates the red light area, the driver needs to stop running and charge as soon as possible, otherwise the battery loss rate will greatly increase in the long run. It is understood that the average charging time of the general battery is about 10 hours. The charging time should be well controlled. If the battery temperature exceeds 65 degrees, the charging should be stopped.

 Wanyuan Guangxi Charging Post Model

Wanyuan Guangxi Charging Post Model

There are four main pain points: A. Battery standardization is too difficult. The separation of vehicle and electricity first requires the standardization of power batteries, BMS standardization, interface standardization, and software management standardization. Any vehicle upgrade must be compatible with the previous generation of products. Battery standardization is too difficult. Every car company wants to make its own electricity exchange standard. It is unrealistic for so many car companies to unify. B. The investment is large and the cost is high. The replacement of power needs to lay a large network, and the investment scale is far greater than charging. Build a power exchange network for a city to provide special tram exchange services. The cost can be recovered only after at least 6-8 years or even more. C. The deflagration hazard of the power plant is large, and the safety hazard is huge. D. It is difficult to improve the customer experience.