Where is Guanghan Guangxi charging post
9. Anti rust (anti oxidation) protection The iron shell of the charging pile (bolt) and the exposed iron support and parts shall be provided with double-layer anti rust measures, and the non-ferrous metal shell shall also be provided with anti oxidation protective film or anti oxidation treatment; 10. The wind protection charger installed on the platform and exposed parts shall be able to withstand the relative wind speed in different areas and at different heights specified in Table 9 of GB/T 4797.5-9 Natural Environmental Conditions for Electrical and Electronic Products - Precipitation and Wind; 11. The shell door of the anti-theft protection electric pile (bolt) shall be equipped with an anti-theft lock, and the bolt fixing the AC charging pile (bolt) must be installed or removed after opening the shell door; 12. The temperature rise requires that the AC charging pile (plug) operates continuously under rated load for a long time, and the temperature rise of internal heating elements and parts shall not exceed the provisions in Table 2 of Q/GDW 397 2009;

Where is Guanghan Guangxi charging post
AC type: Technical requirements for AC charging pile (plug) 1. Requirements for environmental conditions: ① Working environment temperature: - 20 ℃~+50 ℃; ② Relative humidity: 5%~95%; ③ Altitude: ≤ 1000m; ④ Installation site: outdoor; ⑤ Seismic capacity: ground horizontal acceleration 0.3g; Ground vertical acceleration 0.15g; The equipment shall be able to withstand three continuous sine waves under simultaneous action, and the safety factor shall be greater than 1.67; 2. Structural requirements: ① The shell of AC charging pile (bolt) shall be firm; ② In structure, it is necessary to prevent hands from easily touching the exposed part; ③ The AC charging post (bolt) shall be a steel composite structure with a thickness of more than 1.0, and the surface shall be treated with plastic immersion, and the requirements for heat dissipation shall be fully considered. The charging pile (bolt) shall have good shielding function against electromagnetic interference; ④ The charging pile (bolt) shall have sufficient support strength;

Where is Guanghan Guangxi charging post
As a green means of transportation with broad development prospects, the popularization of electric vehicles will be extremely rapid in the future, and the future market prospect is also extremely huge. In the context of the global energy crisis and serious environmental crisis, the Chinese government actively promotes the application and development of new energy vehicles. As an important supporting infrastructure necessary for the development of electric vehicles, the charging/changing station has very important social and economic benefits. A campaign to build an electric vehicle charging/changing station has been launched nationwide. The overall system consists of four parts: electric vehicle charging pile, concentrator, battery management system (BMS), and charging management service platform.
Where is Guanghan Guangxi charging post
A foreign technology company has given a perfect solution: the solar cone they developed is composed of thousands of triangular solar panels. With a specially designed condenser and rotating cone, they can obtain 20 times more light than before, while maintaining the temperature of the core conversion components within a safe range, greatly improving the energy conversion efficiency. Industry insiders believe that this innovation has practical operational significance for photovoltaic power generation, but large-scale popularization still needs to consider the cost and further technical improvement. In order to popularize the application in any industry, it is essential to continuously reduce the cost. Photovoltaic power generation was once very expensive, but driven by economies of scale, the cost of photovoltaic power generation has been declining in recent years, and now it is very close to parity. All this depends on the continuous innovation of photovoltaic technology.

Where is Guanghan Guangxi charging post
In fact, in order to effectively develop the new energy vehicle industry, in addition to the problems exposed in the construction of charging piles, such as difficult site selection, power connection and property coordination, the integration of infrastructure resources, the unification of public charging facilities information platform, the standardization of charging interfaces, and the billing and settlement in the charging process also need to be solved. The charging infrastructure of new energy vehicles is a new type of urban infrastructure. Its construction is a systematic project involving land, power grid, electricity price, mechanism and many other links, which is also the reason why the charging infrastructure construction is relatively difficult. However, as long as the relevant parties meet each other and reach consensus, instead of talking to themselves and going their own way, these problems will eventually be solved.