Heshan Guangxi Charging Post Model
At present, the living standard of our people is constantly improving, and the automobile industry is also growing. The car has been basically popular, but with the increase of cars, many problems have also come. Oil is the fuel of traditional cars, not only in China, but also globally, the oil gap in many regions is growing, and the gap will continue to rise in the future. Moreover, the exhaust emissions also cause air pollution. Developing a low-carbon and environmentally friendly economy has always been an economic model advocated by countries around the world. Vigorously developing new energy models not only can protect the environment and save energy, but also new energy technologies are a new round of business opportunities for major enterprises.
Heshan Guangxi Charging Post Model
Miao Wei, minister of the Ministry of Industry and Information Technology, said at the China Electric Vehicle Hundred Talents Forum (2018) that the current vehicle to pile ratio of 3.5:1 across the country still cannot meet consumers' demand for charging. With the continuous growth of the number of new energy vehicles, the problem of insufficient structural supply of charging infrastructure has become increasingly prominent, and the overall scale is still lagging behind. In 2020, China plans to build about 500000 public charging piles. However, compared with the annual production and sales of 2 million vehicles and 5 million vehicles in the 2020 plan, the number of charging piles still does not match, and the vehicle pile ratio even tends to deteriorate. In addition, the layout of charging facilities in China is also not reasonable. The utilization rate of public charging piles is less than 15%. A sustainable business development model has not yet been formed. There is still a two-way contradiction between operating enterprises' profitability difficulties and consumers' high charging prices.
Heshan Guangxi Charging Post Model
3. Power requirements: ① Input voltage: single-phase 220V; ② Output power: single-phase 220V/5KW; ③ Frequency: 50Hz ± 2Hz; ④ Allowable voltage fluctuation range: single-phase 220V ± 15%; 4. Electrical requirements: ① After the correct connection of plug and socket is confirmed to be successful, the circuit that can be opened and closed with load can be closed to supply power to the socket; ② The leakage protection device shall be installed on the incoming side of the power supply cable; ③ The protection of low-voltage distribution equipment and lines shall meet the relevant provisions in the Code for Design of Low Voltage Power Distribution (GB/50053); ④ For the distribution line of IT system, in case of ground fault, the insulation monitoring device shall send out audio or light signals. In case of the second phase to phase ground fault, the fault circuit shall be cut off by the over-current protection appliance or leakage current action protector; ⑤ In the lighting distribution system, the lighting and socket circuits should not be powered by the same circuit.
Heshan Guangxi Charging Post Model
DC piles are the inevitable choice of public piles in the future: at present, the proportion of public AC and DC charging piles remains around 6:4, and the proportion of AC piles is more, mainly because in the early stage of the industry development, slow charging AC piles are very suitable for manufacturers to seize the market, relying on the characteristics of simple structure, mature technology and low cost, However, after the technology and market of charging piles become mature, DC piles are the inevitable choice for future public charging piles. The average charging time of the DC charging pile is 1 hour and 54 minutes. 85% of the users can finish charging within 2.5 hours, while the average charging time of the AC charging pile is 5 hours and 45 minutes. 66.2% of the users need more than 5 hours of lengthy charging time. The difference between the two nearly 4 hours of time directly determines the obvious use preference of the car owner Z.
Heshan Guangxi Charging Post Model
With the progress of people's life, consumers' requirements for cars are getting higher and higher, especially new energy vehicles. When consumers buy new energy vehicles, the first thing they should pay attention to is the battery and endurance of new energy vehicles, and then the charging of cars. Today, I will tell you about the charging pile of new energy vehicles. Is it GM? According to Xu Xinchao, the core of the charging national standard revision plan expected to be officially released in August this year is to standardize and unify the charging piles of new energy vehicles, and the charging sockets of different models will be unified.
Heshan Guangxi Charging Post Model
The scheme of the charger in the ground charging station, which is composed of a rectifier that can convert the input AC power into DC power and a power converter that can adjust the DC power. By inserting the plug with wires into the supporting socket on the electric vehicle, DC power is input into the battery to charge it. The charger is equipped with a locking lever to facilitate the insertion and removal of the plug. At the same time, the lever can also provide a signal to confirm that it has been locked to ensure safety. According to the communication between the charger and the on-board battery management system, the power converter can adjust the DC charging power online, and the charger can display the charging voltage, charging current, charging amount and charging cost. This is just the basic principle of the charging pile. Many details should be constantly improved in practical application, and a convenient use scheme has been obtained.