There are four main pain points: A. Battery standardization is too difficult. The separation of vehicle and electricity first requires the standardization of power batteries, BMS standardization, interface standardization, and software management standardization. Any vehicle upgrade must be compatible with the previous generation of products. Battery standardization is too difficult. Every car company wants to make its own electricity exchange standard. It is unrealistic for so many car companies to unify. B. The investment is large and the cost is high. The replacement of power needs to lay a large network, and the investment scale is far greater than charging. Build a power exchange network for a city to provide special tram exchange services. The cost can be recovered only after at least 6-8 years or even more. C. The deflagration hazard of the power plant is large, and the safety hazard is huge. D. It is difficult to improve the customer experience.

Mianzhu Electric Vehicle Maintenance Price
Product features: ■ It has four charging modes: on time, according to electricity, according to amount and automatically. ■ It has human-computer interaction function and adopts color LCD touch screen. ■ Display the current charging mode, time, power, and billing information during charging. ■ It has perfect protection functions for leakage, overcurrent, short circuit, overvoltage, undervoltage, etc; At the same time, it has safety protection functions such as emergency stop switch, flame retardant, anti fall, etc. ■ It has perfect safety protection functions such as connection state judgment, control guidance of charging interface, to ensure safe and reliable operation of charging pile. ■ Provide perfect communication function, upload the operating state parameters of AC charging pile as required, monitor the fault type, charging metering, etc., and accept remote control commands.
Mianzhu Electric Vehicle Maintenance Price
Integrated overview: the fast charging pile (plug) equipment adopts the AC/DC integrated structure. It can realize both DC charging and AC charging. When there are many charging services in the daytime, DC mode is used for fast charging. When there are few users in the charging station at night, AC charging can be used for slow charging. Appearance features: 1. Ergonomic design, taking full account of Chinese characteristics, after installation, the height of the whole machine, the height of the screen, the height of the keyboard, and the height of the charging connector slot are suitable for operation; 2. The form of upper outlet saves half of the operator's physical strength; 3. In consideration of people's usage habits and durability, touch and keyboard are mutually backed up. Touch screen and keyboard are designed to be rain proof and dust-proof; 4. Emergency stop switch with emergency stop; The charging connector placement slot is waterproof; 5m long flexible cable.

Mianzhu Electric Vehicle Maintenance Price
The charging pile industry comes with the development of new energy vehicles. In 2020, the charging pile will be included in the new infrastructure and written into the government work report, which will become the precondition for developing new energy vehicles, stimulating new consumption demand and helping the industry upgrade. Under the exploration of new business model and the guidance of a new round of policies, new channels for the development of charging piles have been opened, ushering in new opportunities. The charging pile industry chain is divided into supply terminals such as equipment manufacturers and power suppliers, operation terminals such as operators and new energy vehicle enterprises, and support terminals such as map navigation and payment functions. The core link is the operation end, which is responsible for the investment, construction and operation management of the charging pile. At present, Chinese funded enterprises, private capital and vehicle enterprises are all involved in the operation.

Mianzhu Electric Vehicle Maintenance Price
After the completion of charging piles in some places, operation and maintenance become a problem. On the one hand, the number of urban public charging facilities is small, and the distribution is uneven and unreasonable; On the other hand, the management service platforms of the charging infrastructure construction and operation units have not yet achieved interconnection, nor has there been a unified, open and convenient payment platform, which has caused great inconvenience to charging infrastructure users. In addition, in the development process of new energy vehicle industry, there is a widespread problem of focusing on vehicles rather than charging infrastructure. In addition, the national early support policy is mainly aimed at new energy vehicles and does not cover charging facilities. Except for a few cities, most cities have no local subsidies. "This leads to the coexistence of vehicles without piles and piles without vehicles." Moreover, charging infrastructure construction involves urban planning, construction land, distribution network construction and transformation, property management and other aspects, and it is necessary to coordinate multiple competent departments and relevant units in the implementation process.