Qinzhou Guangxi Charge Point Price
3. Power requirements: ① Input voltage: single-phase 220V; ② Output power: single-phase 220V/5KW; ③ Frequency: 50Hz ± 2Hz; ④ Allowable voltage fluctuation range: single-phase 220V ± 15%; 4. Electrical requirements: ① After the correct connection of plug and socket is confirmed to be successful, the circuit that can be opened and closed with load can be closed to supply power to the socket; ② The leakage protection device shall be installed on the incoming side of the power supply cable; ③ The protection of low-voltage distribution equipment and lines shall meet the relevant provisions in the Code for Design of Low Voltage Power Distribution (GB/50053); ④ For the distribution line of IT system, in case of ground fault, the insulation monitoring device shall send out audio or light signals. In case of the second phase to phase ground fault, the fault circuit shall be cut off by the over-current protection appliance or leakage current action protector; ⑤ In the lighting distribution system, the lighting and socket circuits should not be powered by the same circuit.

Qinzhou Guangxi Charge Point Price
After the completion of charging piles in some places, operation and maintenance become a problem. On the one hand, the number of urban public charging facilities is small, and the distribution is uneven and unreasonable; On the other hand, the management service platforms of the charging infrastructure construction and operation units have not yet achieved interconnection, nor has there been a unified, open and convenient payment platform, which has caused great inconvenience to charging infrastructure users. In addition, in the development process of new energy vehicle industry, there is a widespread problem of focusing on vehicles rather than charging infrastructure. In addition, the national early support policy is mainly aimed at new energy vehicles and does not cover charging facilities. Except for a few cities, most cities have no local subsidies. "This leads to the coexistence of vehicles without piles and piles without vehicles." Moreover, charging infrastructure construction involves urban planning, construction land, distribution network construction and transformation, property management and other aspects, and it is necessary to coordinate multiple competent departments and relevant units in the implementation process.

Qinzhou Guangxi Charge Point Price
With the gradual maturity of the entire new energy vehicle industry chain and the gradual release of market demand, the industry is about to erupt in 2018, but the problems of insufficient structural supply of charging infrastructure and the overall scale lag are increasingly prominent. It is urgent to make up for shortcomings and accelerate the construction of supporting infrastructure such as charging piles. How can we solve the problem of insufficient structural supply of charging infrastructure? Is there any successful case of innovative practice worth learning? There is a big gap in the charging pile. Under the global environment of resource conservation and green economy development, new energy vehicles are developing very rapidly. As the power guarantee of new energy vehicles, the charging pile is highly concerned by all circles. It can be said that the construction of charging infrastructure is one of the key factors affecting the promotion of new energy vehicles in China, and is more related to the development prospects of new energy vehicles.

Qinzhou Guangxi Charge Point Price
AC type: Technical requirements for AC charging pile (plug) 1. Requirements for environmental conditions: ① Working environment temperature: - 20 ℃~+50 ℃; ② Relative humidity: 5%~95%; ③ Altitude: ≤ 1000m; ④ Installation site: outdoor; ⑤ Seismic capacity: ground horizontal acceleration 0.3g; Ground vertical acceleration 0.15g; The equipment shall be able to withstand three continuous sine waves under simultaneous action, and the safety factor shall be greater than 1.67; 2. Structural requirements: ① The shell of AC charging pile (bolt) shall be firm; ② In structure, it is necessary to prevent hands from easily touching the exposed part; ③ The AC charging post (bolt) shall be a steel composite structure with a thickness of more than 1.0, and the surface shall be treated with plastic immersion, and the requirements for heat dissipation shall be fully considered. The charging pile (bolt) shall have good shielding function against electromagnetic interference; ④ The charging pile (bolt) shall have sufficient support strength;